I have three project A/B/C configured dependence as:
A
-B
-C
In normal operation, B/C is builded or rebuilded before A is build or rebuild. However, B is very large, and rebuilding it cost a long time. So for B i need it wound not be rebuilded when rebuild A, while be builded when build A. Is there a good solution?